Model 979 Series Helium Mass Spectrometer Leak Detector
1-16
DRAFT 9/15/03
➀
Main Power
Switch/Circuit
Breaker
The power entry module contains the main power ON/OFF switch/
circuit breaker. The 979 may be powered down in any state. Upon
power down, all internal valves close in order to protect and main-
tain the cleanliness of the vacuum system.
➁
Power Input Filter
Connector
The main power input connector accepts the power cord that is
provided with the leak detector. The power cord is rated for 20 A
service and must not be modified to plug into a lower rated recep-
tacle.
➂
Forepump Power
The 20 A forepump power output connector accepts the mating
connector from the fore/roughing pump of a single mechanical
pump configuration, or the mating connector from the dedicated
forepump of a dual mechanical pump configuration.
➃
Rough Pump
Power
The 20 A rough pump power output connector accepts the mating
connector from the dedicated roughing pump of a dual mechanical
pump configuration. This connection is not used on the single
mechanical pump configuration.
➄
Roughing Valve
Power
The roughing valve power output connector accepts the mating
connector from the roughing valve in dual mechanical pump con-
figurations.
➅
Rough Valve
Circuit Breaker
❑
3.0 A (100 VAC / 115 VAC)
❑
1.5 A (230 VAC)
➆
Turbo Pump
Circuit Breaker
❑
3.0 A (100 VAC / 115 VAC)
❑
1.5 A (230 VAC)
Summary of Contents for 979 Series
Page 139: ......