4-19
Model 979 Series Helium Mass Spectrometer Leak Detector
DRAFT 9/15/03
7. Carefully wipe down and inspect all O-rings before reusing. Replace all damaged
O-rings (Figure 4-23).
Figure 4-23
Inspecting the O-ring
NOTE
Vacuum Technologies recommends replacing all O-rings
during routine maintenance or during any maintenance
procedure requiring that the O-rings be removed.
4.3.7 Reassembly
1. Carefully reassemble the spectrometer tube (Figure 4-24) in the reverse order of these
instructions.
NOTE
The preamplifier assembly has a slot
➀
that must be aligned
with the alignment pin
➁
in the preamplifier cavity of the
spectrometer tube body.
The ground slit plate has a hole in it that must be aligned with
the hole on the bottom of the spectrometer tube body ion
source cavity
➂
.
CAUTION
The ion source must be aligned so that its alignment pin
➃
falls
in the center of this hole.
A short could result at power up if the alignment pin touches
the sides of the alignment hole.
Figure 4-24
Spectrometer Tube Reassembly
➀ ➁
➂
➃
Summary of Contents for 979 Series
Page 139: ......