Installation instructions for geoTHERM exclusive VWS 0020051614_00
20
4.8 Scope
of
delivery
1
5
4
3
2
8
7
6
9
10
11
13
12
14
15
16
17
Fig. 4.8 Checking the supplied material
For key, see Table 4.3.
The heat pump is delivered on a pallet, upright, in four
packing units.
• Check the heat pump and the separately packaged op-
erating console for any transport damage.
Pos. Amount Description
1
1
Heat pump
2
4
Lateral and upper cladding
3
1
Front cladding with frame
4
1
Operating console, pillar cover
5
2
2
12
3
3
2
Gaskets (yellow/green) for heating circuit elbow
unions
M6 flat-headed screws for fitting the operating
console to the frame (plus one spare screw)
M6 slotted pan head bolts for the assembly of the
lateral and the front cladding sections (plus two
spare bolts)
Sheet metal bolts for the assembly of the upper
cladding section (including 1 spare bolt)
Sheet metal bolts for the console terminal frame
(including 1 spare bolt)
Self-tapping screws for fastening the vrnetDIA-
LOG unit
6
4
VR 10 sensors
7
4
90° connection elbow with cap nuts
8
1
Control cable for vrnetDIALOG
9
1
Expansion relief valve for brine circuit, 1/2", 3 bar
10
1
Clamp for fastening the brine expansion tank
11
1
Bag of small parts for fastening the brine expan-
sion tank
14
2
Seals with metal support rings for heat source
circuit connection elbows
13
1
Insulation matting for heat source connection on
the rear wall
14
1
6 litre brine expansion tank, max. 3 bar
15
4
Installation instructions, operating manual,
quick-start guide,
quick installation instructions
16
1
VRC-DCF outside temperature sensor
17
2
GB guarantee card
Table 4.3 Scope of delivery
4 Assembly and installation
Summary of Contents for geoTHERM exclusive
Page 91: ......
Page 92: ...0020051614_00 GB 102008...