M5 controller
Installation Manual
144
CE (European) and FCC compliance
As of January 1, 1996, all new European Union member installations MUST be CE compliant.
To make the M3000 installation CE and FCC compliant, the following conditions must be met:
•
All cables connected to the M3000 must be shielded with shield terminated as shown in
Figure 73
.
•
The M3000 enclosure must be connected to the nearest earth ground. See
Figure 74
on page 145.
Use #8-32 SEMS screw and #8 flat washer provided to secure the ground lug.
•
The Power/Communications board must be in the far right slot of the M3000 card cage and grounded
with a factory-installed braided wire as shown in
Figure 75
on page 145.
•
The CPU board must be in the second slot from the right of the M3000 card cage and grounded with a
factory-installed braided wire as shown in
Figure 75
on page 145.
•
Prior to connecting the network cable to connector J1, loop the cable through the Ferrite provided and
wrap cable around the Ferrite four times as shown in
Figure 76
on page 146.
Note:
Ferrite must be installed inside of the enclosure.
Figure 73.Typical installation using shielded cable/drain wire - outside and inside the enclosure
Outside the enclosure
Inside the enclosure
Summary of Contents for M3000
Page 1: ...M3000 Installation Manual P N 460630001H 15JUNE11 ...
Page 10: ...M3000 Installation Manual x ...
Page 39: ...Chapter 3 Power Communications board 29 Figure 11 Wiring modem to M3000 M 5 or serial printer ...
Page 47: ...Chapter 4 PXNplus CPU board 37 Board layout Figure 16 PXNplus CPU board layout ...
Page 58: ...M3000 Installation Manual 48 Board layout Figure 17 2RP reader board layout ...
Page 68: ...M3000 Installation Manual 58 Figure 24 Wiring 2RP door strike external relay ...
Page 72: ...M3000 Installation Manual 62 Board layout Figure 27 2SRP supervised reader board layout ...
Page 82: ...M3000 Installation Manual 72 Figure 19 Wiring 2SRP door alarm contact and exit request ...
Page 84: ...M3000 Installation Manual 74 Figure 21 Wiring 2SRP door strike external relay ...
Page 89: ...Chapter 5 Reader processing boards 79 Board layout Figure 24 8RP reader board layout ...
Page 92: ...M3000 Installation Manual 82 Figure 26 Wiring 8RP to F 2F or Supervised F 2F Readers ...
Page 94: ...M3000 Installation Manual 84 ...
Page 97: ...Chapter 6 Optional DI and DO boards 87 Figure 31 20DI board layout ...
Page 99: ...Chapter 6 Optional DI and DO boards 89 Figure 32 Wiring DI point ...
Page 101: ...Chapter 6 Optional DI and DO boards 91 Figure 33 16DO board layout ...
Page 102: ...M3000 Installation Manual 92 Figure 34 16DOR board layout ...
Page 104: ...M3000 Installation Manual 94 Figure 36 Wiring output device to 16DOR board ...
Page 152: ...M3000 Installation Manual 142 ...
Page 156: ...M5 controller Installation Manual 146 Figure 76 Installing ferrite ...
Page 160: ...M5 controller Installation Manual 150 ...
Page 172: ...M3000 Installation Manual 162 ...