3: Installation and Set-up
24
UPS725-02-02 PowerWave 1000 (4.5 - 10 kVA) User Manual UK Dated 13/03/15
Figure 3.8 Fixing points for captive nuts
Once the UPS has been installed, if necessary, rotate the UPS control panel so that it is correctly orientated. To achieve
this, carefully pull the control panel forward to unclip it from its mounting, rotate it to the correct angle, then relocate it and
press it back into place.
B5
B3
B7
B6
B3
B7
B6
B6
B3
B7
B5
B5
2U Fixing
Adjustable rail
Rack fixing rail
Adapter plate
Adjustable rail
Rack fixing rail
Adapter plate
3U Fixing
Adjustable rail
Rack fixing rail
Adapter plate
4U Fixing