3: Installation and Set-up
22
UPS725-02-02 PowerWave 1000 (4.5 - 10 kVA) User Manual UK Dated 13/03/15
3.4
Rack configuration set-up
Figure 3.5 UPS Rack mounting kit
The PowerWave 1000 UPS and battery enclosure(s) can be installed in a standard 19 inch rack, and can be either shelf
mounted or installed on adjustable mounting rails that are provided as part of the rack installation kit. If the batteries are
housed in a separate enclosure, it should be mounted on an adjacent shelf in the same rack using same procedure as
mounting the UPS. The two enclosures are then later connected together using the supplied interconnecting cable.
Figure 3.6 Rack mounting options
3.4.1 Installing the adjustable mounting rails
The adjustable mounting rail kit contains a pair of mounting rails (left and right handed) that are fitted to each side of the
cabinet and secured by two screws – front and back. The rails can be extended to any length between 543 mm and 925
mm and are compatible with most standard 19 inch rack assemblies of 600 mm to 900 mm depth.
CAUTION: When rack-mounting the equipment always install it at the bottom of the cabinet with the battery
enclosure installed below the UPS enclosure.
B1
1 x Adjustable mounting rail (Left)
B2
1 x Adjustable mounting rail (Right)
B3
2 x Adapter plate
B4
2 x Rack mounting handle
B5
12 x Captive nuts
B6
8 x Dome head bolts
B7
4 x Countersunk bolts
B1
B4
B3
B5
B6
B7
B2
Shelf mounting
Adjustable mounting rails
B2
B1
FRONT