Dimensions and Weights
Unit Clearances
The figure below illustrates the minimum operating
and service clearances for either a single, multiple, or
pit application. These clearances are the minimum
distances necessary to assure adequate serviceability,
cataloged unit capacity, and peak operating efficiency.
IIm
mp
po
orrtta
an
ntt:: Providing less than the recommended
clearances could result in condenser coil
starvation or recirculation of hot condenser
air.
Locate the unit as close to the applicable system
support equipment as possible to minimize refrigerant
piping lengths.
Allow adequate clearance for water and refrigerant
piping connections, space to perform service
procedures, i.e. read gauges, thermometers, and
operate water system valves.
N
No
otte
e:: EVP braze plate chiller installation must also
allow adequate clearance as described above.
N
No
otte
e:: EVP chiller is intended for indoor application. If a
sub-freezing location is required, contact Trane
for installation precautions required to prevent
damage.
Figure 4. Unit clearances
Typical “Single Unit” Installation
Typical “Side-by-Side” Installation
Typical “Pit” Installation
1.5
tim
es u
ni
t height
E
B
C
A
D
E
F
F
G
G
Front
Control
Panel