SS-SVX11K-EN
55
Installation Mechanical — EVP
EVP Chilled Water Piping
Requirements
•
Install properly sized chilled water pipe between the
EVP chiller and the supporting equipment. See
Chilled Water Piping section for recommended
system components and guidelines.
•
Install supply and return water side pressure
gauges (with isolation valves.)
•
Install thermometers in water supply and return
piping.
•
Install isolation (shutoff) valves in water supply and
return piping.
•
Install a properly sized strainer in the supply piping.
•
Install blowdown (recommended) valve or plug in
strainer cleanout.
•
Install a balancing valve in the return piping.
•
Install a water flow switch in the return piping.
•
Install chilled solution sensor well and sensor in the
water outlet piping.
•
Install freezestat well and freezestat bulb in the
water outlet piping.
•
Install chiller piping drain with shutoff valve.
•
Install 1/2” x 14 NPT stainless steel or PVC plug in
braze plate chiller body.
•
Flush the chilled solution piping system, if
applicable.
•
Connect the chilled solution piping to the chiller.
•
The braze plate chiller is intended for indoor
application. If a subfreezing location is required,
contact Trane for installation precautions required
to prevent damage.
•
If using an acidic, commercial flushing solution to
prevent damage to the internal evaporator
components, flush all chilled solution piping before
making the final connection to the EVP chiller.
TXV for Remote Chiller
Piping between TXV and Chiller, a braze plate heat
exchanger (BPHE), must be 8-12” long and same size
as BPHE inlet ID. Field supplied reducer(s) may be
required at TXV. A bleed port valve is not required with
brazed plate heat exchanger applications.
N
No
otte
ess::
•
Install reducers at the TXV outlet only.
•
See Dimensions and Weights chapter for
BPHE inlet dimensions.
•
See Expansion Valve Selection tables in the
Installation Mechanical chapter for valve
selections.
Typical Field-Installed EVP
Chiller Evaporator Piping
N
NO
OT
TIIC
CE
E
H
He
ea
att E
Ex
xcch
ha
an
ng
ge
err D
Da
am
ma
ag
ge
e!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w iin
nssttrru
uccttiio
on
nss b
be
ello
ow
w cco
ou
ulld
d rre
essu
ulltt iin
n
rre
effrriig
ge
erra
an
ntt lle
ea
akkss o
orr d
da
am
ma
ag
ge
e tto
o tth
he
e h
he
ea
att e
ex
xcch
ha
an
ng
ge
err..
T
Th
he
e b
brra
azze
e cco
on
nn
ne
eccttiio
on
nss a
att tth
he
e h
he
ea
att e
ex
xcch
ha
an
ng
ge
err a
arre
e
sstta
aiin
nlle
essss sstte
ee
ell.. U
Usse
e 4
40
0--4
45
5%
% ssiillv
ve
err b
brra
azziin
ng
g a
allllo
oy
y
B
BA
Ag
g--7
7 o
orr B
BA
Ag
g--2
29
9 ffo
orr cco
op
pp
pe
err tto
o sstte
ee
ell rre
effrriig
ge
erra
an
ntt
cco
on
nn
ne
eccttiio
on
nss.. U
Usse
e ffllu
ux
x ssp
pa
arriin
ng
glly
y tto
o p
prre
ev
ve
en
ntt
p
pllu
ug
gg
giin
ng
g h
he
ea
att e
ex
xcch
ha
an
ng
ge
err ffllo
ow
w p
pa
assssa
ag
ge
ess..
1. Install the TXV(s) directly to the unit liquid
connection. See TXV recommendations in the Tube
Size and Component Selection Application Guide,
publication number SS-APG012-EN.
N
NO
OT
TIIC
CE
E
E
Ev
va
ap
po
orra
atto
orr D
Da
am
ma
ag
ge
e!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w iin
nssttrru
uccttiio
on
nss b
be
ello
ow
w cco
ou
ulld
d rre
essu
ulltt iin
n
e
ev
va
ap
po
orra
atto
orr d
da
am
ma
ag
ge
e..
T
To
o p
prre
ev
ve
en
ntt e
ev
va
ap
po
orra
atto
orr d
da
am
ma
ag
ge
e a
an
nd
d ffo
orr p
prro
op
pe
err
rre
effrriig
ge
erra
an
ntt d
diissttrriib
bu
uttiio
on
n,, a
an
n 8
8--1
12
2”
” ssttu
ub
b ttu
ub
be
e m
mu
usstt
b
be
e b
brra
azze
ed
d b
be
ettw
we
ee
en
n tth
he
e e
ex
xp
pa
an
nssiio
on
n v
va
allv
ve
e a
an
nd
d tth
he
e
cch
hiilllle
err e
en
ntte
erriin
ng
g rre
effrriig
ge
erra
an
ntt cco
on
nn
ne
eccttiio
on
n.. T
Th
hiiss ttu
ub
be
e
m
mu
usstt b
be
e tth
he
e ssa
am
me
e d
diia
am
me
ette
err a
ass tth
he
e h
he
ea
att e
ex
xcch
ha
an
ng
ge
err
cco
on
nn
ne
eccttiio
on
n IID
D.. U
Usse
e rre
ed
du
ucce
errss o
on
nlly
y a
att tth
he
e e
ex
xp
pa
an
nssiio
on
n
v
va
allv
ve
e.. S
Se
ee
e d
diim
me
en
nssiio
on
n d
drra
aw
wiin
ng
gss ffo
orr iin
nlle
ett
d
diim
me
en
nssiio
on
nss..
2. Locate TXV bulb on top of the suction line 12” from
the heat exchanger outlet.
3. Secure the bulb to the suction line with two clamps
provided by the manufacturer and insulate the bulb.
4. Locate liquid line solenoid valve(s) near TXV.
5. Install the Frostat™ according to instructions
enclosed in the kit as close to the evaporator as
possible.