Installation - Mechanical
UNT-SVX041D-EN
25
Note:
3.1-inch long riser stub outs are provided from the
factory for use with field installed risers.
Depending on the riser diameter and insulation
thickness selected, field provided and installed
risers will require stub out extensions. Refer to the
recommended installation diagram for details.
Figure 13.
Recommended installation layout for field-provided risers
RA
RA
RA
Back Riser
Left Riser
Right Riser
4.13
4.13
3.00
3.00
Top View
HWS = Hot Water Supply Riser
HWR = Hot Water Return Riser
CWS = Chilled Water Supply Riser
CWR = Chilled Water Return Riser
Cond.= Condensate Riser
CWS
CWR
Cond
HWS
HWR
CWS
CWR
Cond
HWS
HWR
CWS
CWR
Cond
HWS
HWR