BSIA System Installation
Step 2: Run Cable
20
Strata AirLink Installation Guide 5/00
Figure 16
ALM Connections on the BSIA
Step 2: Run Cable
1. Run the cable from the Base Stations to the BSIA, using the following maximum cabling
distances:
♦
2,000 feet for line power
♦
3,300 feet for local power
2. Use Category 5 cable. Using a mix of Categories 2, 3, 4, and 5 is acceptable, but can affect the
total possible cable length. See
Figure 19
on
Page 22
for the wiring diagram.
3. Connect the
transmit
cable
(pair 21 or 25) to the receive
side (see
Figure 17
).
4. Connect the
receive
cable (pair
20 or 24) to the transmit jack
(see
Figure 17
).
Standoffs
ALM Plugged into
DIN Connector J4 (Circuits 9~16)
2964
DIN Connector J5
(Circuits 17~24)
DIN Connector J6
(Circuits 25~32)
Amphenol Connector
(Circuits 1~16)
Amphenol Connector
(Circuits 17~32)
2982
Transmit Jack
Receive Jack
Debug (not used)
Antenna
Antenna
Power Cord
Strain Relief
+5VDC Local Power
Figure 17
Location of Transmit and Receive Jacks
Summary of Contents for Strata AirLink
Page 6: ...Contents Chapter 5 Maintenance and Troubleshooting iv Strata AirLink Installation Guide 5 00 ...
Page 10: ...Introduction Related Documents Media viii Strata AirLink Installation Guide 5 00 ...
Page 28: ...Pre installation Step 10 Mount Base Stations 18 Strata AirLink Installation Guide 5 00 ...
Page 106: ...Maintenance and Troubleshooting Troubleshooting 96 Strata AirLink Installation Guide 5 00 ...