g033329
Figure 76
1.
Flange clamp
7.
Flanged locknut
2.
Gasket
8.
Flange (rate-control valve)
3.
Manifold (agitation valve)
9.
Flange (master-section
valve)
4.
Flange
(manifold—agitation-bypass
valve)
10.
Retainer
5.
Flanged-head bolt
11.
Socket (outlet fitting)
6.
Valve mount
2.
Assemble the agitation-bypass valve, gasket,
and agitation-valve manifold with a clamp
tightened by hand (
A).
3.
Align a gasket between the flanges of the
rate-control valve and the agitation-valve
manifold (
B).
4.
Assemble the gasket and agitation-valve
manifold with a clamp tightened by hand (
5.
Align a gasket between the flanges of the
agitation-valve manifold and the master-section
valve (
6.
Assemble the agitation-valve manifold, gasket,
and master-section valve with a clamp tightened
by hand (
B).
7.
Assemble the agitation-valve manifold and
socket with a clamp tightened by hand (
8.
Secure the end-cap fitting to the outlet fitting by
inserting a retainer into the socket of the outlet
fitting (
C).
9.
Assemble the agitation valve to the valve mount
with the flanged-head bolt and flanged locknut
that you removed in step
of
Agitation-Manifold Valve (page 59)
and torque
the nut and bolt to 1017 to 1243 N∙cm (90 to
110 in-lb).
10.
If you loosened the mounting hardware for the
master-section valve, tighten the nut and bolt to
1978 to 2542 N∙cm (175 to 225 in-lb).
Installing the
Master-Section-Manifold Valve
1.
Align the flange of the master-section-valve
manifold, 1 gasket, and the flange of the
master-section-bypass valve (
g033330
Figure 77
1.
Flange clamp
6.
Valve mount
2.
Gasket
7.
Flanged locknut
3.
Manifold (master-section
valve)
8.
Flange (agitation valve)
4.
Flange
(bypass—master-section
valve)
9.
Retainer
5.
Flanged-head bolt
10.
Socket (outlet fitting)
65
Summary of Contents for Multi Pro 1750
Page 72: ...Schematics g028078 Sprayer System Schematic Rev DWG 125 0698 Rev B 72...
Page 73: ...Notes...
Page 74: ...Notes...