6
Please note –
A technically competent person should carry out the
installation of your TileVision
®
unit.
First Fix Kit – Initial Assembly
Unpacking your TileVision
®
Within the back box there are two right-angled brackets and fixing screws. Screw the brackets to
the outside of the back box but be aware these will need to be loosened to allow adjustment of
the back box when fitted into the wall.
As shown below, the brackets allow 34 mm of forwards/backwards adjustment so that the front
of the back box can fit flush with the tiled surface. Any additional adjustment needed to ensure
the front of the back box is flush with the tiles should be considered before fitting the back box.
70
34
The range of adjustment available with the back box brackets
The qualified
electrical installer
must use one of the
earthing screws as
an earth point to
earth the unit to
ground.
The lead used must
be terminated with a
ring terminal, which,
together with the
earthing cable’s ring
terminal, is fastened
using the supplied
locking washer and
screw.
Lead to electrical earthing point
(not supplied)