![Thermo Finnigan LTQ Hardware Manual Download Page 111](http://html.mh-extra.com/html/thermo/finnigan-ltq/finnigan-ltq_hardware-manual_1104223111.webp)
MS Detector Maintenance
'JOOJHBO-52
_____________________________________________________________________________
_______________________ Finnigan LTQ Hardware Manual ______________________
4-3
5IFSNP
&-&$530/$03103"5*0/
Ion detection system
Clean ion detection
system (electron
multiplier and
conversion dynode)
Whenever the top
cover plate of the
vacuum manifold is
removed
Page 4-36
Mass analyzer
Clean mass analyzer
2
Very rarely (if ever)
1
Page 4-38
Rotary-vane pump
Add oil
If oil level is low
Manufacturer’s
documentation
Rotary-vane pump
Change oil
Every 3 months or if oil
is cloudy or discolored
Manufacturer’s
documentation
Ion detection system
Replace electron
multiplier assembly
2
If noise in spectrum is
excessive or proper
electron multiplier gain
can not be achieved
Page 4-39
Turbomolecular pump
Replace
turbomolecular pump
insert
2
Every 20,000 to 30,000
hours or if bearings fail
Page 4-43
Electronic modules
Replace electronic
module
2
If electronic module
fails
Diagnostics and PCB
and Assembly
Replacement chapter
PCBs
Replace PCB
2
If PCB fails
Diagnostics and PCB
and Assembly
Replacement chapter
1
Frequency depends on analytical conditions
2
We recommend that this maintenance procedure be performed by a Thermo Electron Field Service Engineer
Table 4-1.
MS detector maintenance procedures, continued
MS Detector
Component
Procedure
Frequency
Procedure Location