Chapter 3
Replace the Split Line Tubing
Maintaining a Large Volume Splitless Injector
Maintenance and Troubleshooting Manual
77
11. Connect the new split line tubing to the injector
body.
a. On the end of the new split line tubing
having the greater diameter, slide the 5/16”
brass nut and the brass front/back ferrule.
b. Fully insert the tubing into the fitting on the
injector body and rotate the nut finger-tight.
c. Mark the nut at the 12 o’clock position.
d. While holding the fitting body steady,
tighten the nut tree-quarters turn to the 9
o’clock position.