5
Installation
ISQ EC and ISQ EM Mass Spectrometer Operating Manual
Page 69
If you are using 230 V, you must remove the two screws and flip the cover
over so the blue label indicating 230 V is at the top.
WARNING—Electric Shock or Damage to a Product
The pump voltage must match that of the power supplied to the MS
instrument. Failure to match the voltage may result in pump and/or
instrument damage.
AVERTISSEMENT—Risque de choc électrique ou d’endommagement
d’un produit
La tension de la pompe doit correspondre à celle fournie au spectromètre
de masse. Dans le cas contraire, la pompe ou l’instrument risque d’être
endommagé.
Figure 5: Foreline Edwards pump voltage setting
Then, check that the pump is set to high vacuum mode. The mode selector
knob on the side of the system should be turned to the very right (towards
the small droplets).
Next, install the oil mist filter assembly and oil return kit.
Summary of Contents for ISQ EC
Page 1: ...ISQ EC and ISQ EM Mass Spectrometer Operating Manual 1R120591 0002 Revision E February 2019 ...
Page 4: ...Page 4 ISQ EC and ISQ EM Mass Spectrometer Operating Manual ...
Page 66: ...5 Installation Page 66 ISQ EC and ISQ EM Mass Spectrometer Operating Manual ...
Page 135: ...6 Operation ISQ EC and ISQ EM Mass Spectrometer Operating Manual Page 135 ...
Page 204: ...7 Maintenance and Service Page 204 ISQ EC and ISQ EM Mass Spectrometer Operating Manual ...
Page 228: ...12 Index Page 228 ISQ EC and ISQ EM Mass Spectrometer Operating Manual 12 Index ...
Page 229: ...12 Index ISQ EC and ISQ EM Mass Spectrometer Operating Manual Page 229 ...