5
Installation
ISQ EC and ISQ EM Mass Spectrometer Operating Manual
Page 99
Figure 44: Disconnect PEEK capillary connection of source at grounding union
4)
Pull-up on the two cam levers located on the lower right and left-
hand side of the source housing. As the cams rotate, the source
housing will come away from the bulkhead and will slide off the two
metal guide rods as shown in Figure 46.
Figure 45: Removal of source housing
5)
Slowly remove the source housing as shown in Figure 46, taking care
to avoid damage to the ESI probe and capillary connection.
Summary of Contents for ISQ EC
Page 1: ...ISQ EC and ISQ EM Mass Spectrometer Operating Manual 1R120591 0002 Revision E February 2019 ...
Page 4: ...Page 4 ISQ EC and ISQ EM Mass Spectrometer Operating Manual ...
Page 66: ...5 Installation Page 66 ISQ EC and ISQ EM Mass Spectrometer Operating Manual ...
Page 135: ...6 Operation ISQ EC and ISQ EM Mass Spectrometer Operating Manual Page 135 ...
Page 204: ...7 Maintenance and Service Page 204 ISQ EC and ISQ EM Mass Spectrometer Operating Manual ...
Page 228: ...12 Index Page 228 ISQ EC and ISQ EM Mass Spectrometer Operating Manual 12 Index ...
Page 229: ...12 Index ISQ EC and ISQ EM Mass Spectrometer Operating Manual Page 229 ...