3
Installing Flash IRMS Elemental Analyzer
Installing the Reactors into the Furnaces
Thermo Scientific
EA IsoLink IRMS System for CNSOH Operating Manual
61
Figure 58.
Introduction of the Combustion Reactor Into the Right Furnace (1)
2. Onto the bottom end of the reactor, which protrudes from the bottom of the furnaces, slide first
the reactor retaining nut, then the washer, and finally the conical O-ring, paying attention that the
conical section of the O-ring must be turned downwards. See
Figure 59.
Conical O-ring
Figure 60.
Introduction of the Combustion Reactor Into the Right Furnace (2)
3. Insert the reactor end into the coupling union located on the base of the furnace compartment.
See
.
Conical O-ring
Reactor
Conical Section
Retaining Nut
Washer
Conical O-ring