![Thermo Scientific EA IsoLink IRMS System Operating Manual Download Page 80](http://html.mh-extra.com/html/thermo-scientific/ea-isolink-irms-system/ea-isolink-irms-system_operating-manual_1105021080.webp)
3
Installing Flash IRMS Elemental Analyzer
Preliminary Information
52
EA IsoLink IRMS System for CNSOH Operating Manual
Thermo Scientific
Unpacking the Instrument
After inspecting the exterior of the shipping container for damage carefully unpack the instrument and
do the following:
1. Check the contents of each box against the packing list to verify the shipment is complete.
2. Inspect each item for damage.
a.
If equipment is damaged, keep boxes and their equipment in their existing condition and
immediately notify the carrier.
b. Submit a damage claim directly to the carrier, and send a copy (including any shortage claim)
to your authorized Thermo Fisher Scientific sales representative.
c.
Do not return any equipment to the dealer or the factory without prior Thermo Fisher
Scientific authorization.
Placing the Instrument
Place the EA IsoLink IRMS System for CNSOH on the workbench, allowing free access to electrical
connections and gas lines.
You should already have prepared your laboratory according to the space requirements specified in the
Preinstallation Requirements Guide.
The gas and power supplies should have been made accessible.
Optional equipment should be placed near the analyzer to be easily connected.
ATTENTION
This operation must be carried out by a Thermo Scientific Field Service Engineer.
LIFTING HAZARD
The Flash IRMS Elemental Analyzer weighs approximately 65 kg (145 lb)
when unpacked. Pay attention when lifting the instrument onto the workbench. At least TWO
people should perform this operation, each standing on left/right side of the instrument and
putting their hands near its supporting feet
.