Maintenance Inspection Schedule (Rev 6/98)
6
REFRIGERATION
•
•
•
Check refrigerant level.
•
•
•
Check for proper suction pressure.
•
Check compressor oil level and condition.
•
•
Check throttling valve regulating pressure on defrost.
•
Check compressor efficiency and pump down refrigeration system.
•
Replace dehydrator and check discharge and suction pressure.
STRUCTURAL
•
•
•
Visually inspect unit for fluid leaks.
•
•
•
Visually inspect unit for damaged, loose or broken parts (includes air
ducts and bulkheads).
•
•
Inspect tapered roller bearing fanshaft and idlers for leakage and
bearing wear (noise).
•
•
Clean entire unit including condenser and evaporator coils and
defrost drains.
•
•
Check all unit and fuel tank mounting bolts, brackets, lines, hoses,
etc.
•
•
Check evaporator damper door adjustment and operation.
Pretrip
Every/
1,500
Hours
Annual/
4,500
Hours
Inspect/Service These Items
Summary of Contents for Super II SR+
Page 4: ......
Page 10: ...ii ...
Page 14: ...4 ...
Page 22: ...Unit Description Rev 6 98 12 Front View AEA1350 ...
Page 23: ...Unit Description Rev 6 98 13 Right Side Door Open AEA1351 ...
Page 24: ...Unit Description Rev 6 98 14 Left Side Doors Open AEA1352 ...
Page 26: ...Operating Instructions Rev 6 98 16 Control Box Cover AEA1354 ...
Page 34: ...24 ...
Page 42: ...Electronic Controls Rev 6 98 32 SOFTWARE REVISION 04XX ALARMS AEA1358 ...
Page 82: ...72 ...
Page 90: ...80 ...
Page 116: ...106 ...
Page 120: ...110 ...
Page 130: ...120 ...
Page 141: ...131 Schematic Diagram SBIII SII RMNII 30 SR MPIV ...
Page 142: ...132 Wiring Diagram SII SBIII RMN30 SR MPIV Page 1 of 4 ...
Page 143: ...133 Wiring Diagram SII SBIII RMN30 SR MPIV Page 2 of 4 ...
Page 144: ...134 Wiring Diagram SII SBIII RMN30 SR MPIV Page 3 of 4 ...
Page 145: ...135 Wiring Diagram SII SBIII RMN30 SR MPIV page 4 of 4 ...