4 - 22
Z-45/25 Bi-Energy • Z-45/25J Bi-Energy
Part No. 237062
September 2015
Section 4 • Repair Procedures
SECONDARY BOOM COMPONENTS
10 Remove the pin retaining fasteners from both
sides of the secondary boom lift cylinder rod-
end pivot pin and barrel-end pivot pin. Do not
remove the pins.
11 Attach a strap from an overhead crane to the lug
on the rod end of one of the secondary boom lift
cylinders for support. Do not apply any lifting
pressure.
12 Use a soft metal drift to drive the barrel-end
pivot pin half way out. Lower the barrel end of
the secondary boom lift cylinder and let it hang
down.
13 Use a soft metal drift to drive the rod-end pivot
pin half way out.
14 Remove the secondary boom lift cylinder from
the machine.
15 Repeat steps 11 through 14 for the other
secondary boom lift cylinder.
Crushing hazard. The secondary
boom lift cylinder could become
unbalanced and fall when
removed from the machine if not
properly attached to the overhead
crane.
Component damage hazard. When
removing a secondary boom lift
cylinder from the machine, be
careful not to damage the
counterbalance valve at the barrel
end of the cylinder.
16 Attach a lifting strap from an overhead crane to
the upper pivot for support. Do not lift it.
17 Attach a lifting strap from a second overhead
crane to the number 1 arm at the midpoint
between the upper pivot and mid-pivot.
18 Remove the pin retaining fasteners from the
number 1 arm pivot pins at the mid-pivot and
the upper pivot. Do not remove the pins.
19 Use a soft metal drift to drive both pins out.
20 Remove the number 1 arm from the machine.
Crushing hazard. The number 1
arm could become unbalanced
and fall when removed from the
machine if not properly attached to
the overhead crane.
Crushing hazard. The upper pivot
could fall when the number 1 arm
is removed from the machine if not
properly supported by the
overhead crane.
21 Using the overhead crane attached to the upper
pivot, raise the secondary boom assembly
approximately 30 inches / 76 cm.
22 Insert a 4 x 4 x 11 inch / 10 x 10 x 28 cm block
between the number 2 arm and the boom rest.
Then lower the secondary boom assembly onto
the block.
Crushing hazard. The secondary
boom assembly could fall if not
properly supported by the
4 x 4 x 11 inch / 10 x 10 x
28 cm block.
Summary of Contents for Genie Z-45/25 Bi-Energy
Page 1: ......
Page 203: ...6 79 Section 6 Schematics September2015 Engine Panel Wiring Diagram 6 80 ...
Page 206: ...6 82 September2015 Section 6 Schematics Power Panel Wiring Diagram 6 81 ...
Page 207: ...6 83 Section 6 Schematics September2015 6 84 CTE Option Wiring Diagram CE ...
Page 210: ...6 86 September2015 Section 6 Schematics 6 85 Charger Interlock Option ...
Page 212: ...6 88 September2015 Section 6 Schematics Hydraulic Schematic 6 87 ...
Page 213: ......