Part No. 237062
Z-45/25 Bi-Energy • Z-45/25J Bi-Energy
4 - 11
September 2015
Section 4 • Repair Procedures
PRIMARY BOOM COMPONENTS
8 Tag and disconnect the hydraulic hoses from
the platform leveling slave cylinder and connect
them together using a connector. Cap the
fittings on the cylinder.
Bodily injury hazard. Spraying
hydraulic oil can penetrate and
burn skin. Loosen hydraulic
connections very slowly to allow
the oil pressure to dissipate
gradually. Do not allow oil to
squirt or spray.
9 Pull the four hydraulic hoses toward the
platform to clear the rod end of the primary
boom lift cylinder.
10 Place blocks in between the upper and lower
cable tracks and secure the upper and lower
tracks together.
Crushing hazard. If the upper and
lower cable tracks are not properly
secured together, the cable track
could become unbalanced and fall
when removed from the machine.
11 Remove all hose and cable clamps from the
underside of the primary boom.
12 Attach a strap from an overhead crane to the
cable track.
13 Remove the mounting fasteners from the upper
cable track at the platform end of the extension
boom.
14 Remove the cable track mounting fasteners that
attach the lower cable track to the primary
boom.
15 Remove the cable track from the machine and
place it on a structure capable of supporting it.
Crushing hazard. The cable track
could become unbalanced and fall
if not properly attached to the
overhead crane.
Component damage hazard.
Cables and hoses can be damaged
if they are kinked or pinched.
How to Remove the Cable Track,
Z-45/25J
Note: When removing a hose assembly or fitting,
the O-ring on the fitting and/or hose end must be
replaced and then torqued to specification during
installation. Refer to Section 2,
Hydraulic Hose and
Fitting Torque Specifications.
1 Locate the cables from the primary boom cable
track to the platform control box. Number each
cable and its entry location at the platform
control box.
2 Disconnect the cables from the platform control
box.
3 Remove the hose and cable cover from the side
of the jib boom. Remove the hose and cable
separators.
Summary of Contents for Genie Z-45/25 Bi-Energy
Page 1: ......
Page 203: ...6 79 Section 6 Schematics September2015 Engine Panel Wiring Diagram 6 80 ...
Page 206: ...6 82 September2015 Section 6 Schematics Power Panel Wiring Diagram 6 81 ...
Page 207: ...6 83 Section 6 Schematics September2015 6 84 CTE Option Wiring Diagram CE ...
Page 210: ...6 86 September2015 Section 6 Schematics 6 85 Charger Interlock Option ...
Page 212: ...6 88 September2015 Section 6 Schematics Hydraulic Schematic 6 87 ...
Page 213: ......