7 Carefully move the test weights to each
remaining location in the platform.
Result: The alarm should be sounding.
The platform overload indicator light should be
flashing at both the ground and platform
controls.
Result: If the alarm does not sound and the
platform overload indicator light does not come
on with the test weights in any of the platform
locations, the platform overload system needs
to be calibrated. See D-5,
Calibrate the
Platform Overload System
.
Note: There may be an approximate 2 second delay
before the overload indicator light turns on and the
alarm sounds.
8 Test all machine functions from the platform
controls.
Result: All platform control functions should not
operate.
9 Turn the key switch to ground control.
10 Test all machine functions from the ground
controls.
Result: All ground control functions should not
operate.
Note: Machine functions should still operate with
auxiliary power at the ground controls.
CHECKLIST
C
PROCEDURES
11 Lift the test weights off the platform floor using a
suitable lifting device.
Result: The platform overload indicator light and
alarm should turn off at both the ground and
platform controls.
Note: There may be an approximate 2 second delay
before the overload indicator light and alarm turn
off.
12 Test all machine functions from the ground
controls.
Result: All ground control functions should
operate normally.
13 Turn the key switch to platform control.
14 Test all machine functions from the platform
controls.
Result: All platform control functions should
operate.
Note: If the platform overload system is not
operating properly, see D-5,
Calibrate the Platform
Overload System.
Summary of Contents for Genie Z-45/25 Bi-Energy
Page 1: ......
Page 203: ...6 79 Section 6 Schematics September2015 Engine Panel Wiring Diagram 6 80 ...
Page 206: ...6 82 September2015 Section 6 Schematics Power Panel Wiring Diagram 6 81 ...
Page 207: ...6 83 Section 6 Schematics September2015 6 84 CTE Option Wiring Diagram CE ...
Page 210: ...6 86 September2015 Section 6 Schematics 6 85 Charger Interlock Option ...
Page 212: ...6 88 September2015 Section 6 Schematics Hydraulic Schematic 6 87 ...
Page 213: ......