3 - 6
Z-45/25 Bi-Energy • Z-45/25J Bi-Energy
Part No. 237062
September 2015
Section 3 • Scheduled Maintenance Procedures
Checklist D
Y N R
D-1 Boom wear pads
D-2 Free-wheel
configuration
D-3 Drive hub oil
D-4 Hydraulic return filter
D-5 Calibrate platform
overload system
(if equipped)
D-6 Turntable bearing bolts
D-7 Turntable bearing wear
Perform every 1500 hours:
D-8 Perform engine
maintenance
Checklist E
Y N R
E-1
Hydraulic oil
E-2
Wheel bearings
E-3 Perform engine
maintenance
Perform every 3000 hours:
E-4 Perform engine
maintenance
Instructions
• Make copies of this page to use for
each inspection.
• Select the appropriate checklist(s) for
the type of inspection to be
performed.
Daily or 8 hour
Inspection:
A
Quarterly or 250 hour
Inspection:
A+B
Six Month or 500 hour
Inspection:
A+B+C
Annual or 1000 hours
Inspection:
A+B+C+D
2 Year or 2000 hour
Inspection:
A+B+C+D+E
• Place a check in the appropriate box
after each inspection procedure is
completed.
• If any inspection receives an “N”, tag
and remove the machine from
service, repair and reinspect it. After
repair, place a check in the “R” box.
Legend
Y = yes, acceptable
N = no, remove from service
R = repaired
Comments
Model
Serial number
Date
Hour meter
Machine owner
Inspected by (print)
Inspector signature
Inspector title
Inspector company
MAINTENANCE INSPECTION REPORT
Summary of Contents for Genie Z-45/25 Bi-Energy
Page 1: ......
Page 203: ...6 79 Section 6 Schematics September2015 Engine Panel Wiring Diagram 6 80 ...
Page 206: ...6 82 September2015 Section 6 Schematics Power Panel Wiring Diagram 6 81 ...
Page 207: ...6 83 Section 6 Schematics September2015 6 84 CTE Option Wiring Diagram CE ...
Page 210: ...6 86 September2015 Section 6 Schematics 6 85 Charger Interlock Option ...
Page 212: ...6 88 September2015 Section 6 Schematics Hydraulic Schematic 6 87 ...
Page 213: ......