11 Raise the boom to a horizontal position.
12 Place blocks between the upper and lower cable
tracks and secure the upper and lower tracks
together.
Crushing hazard. If the upper and
lower cable tracks are not properly
secured together, the cable track
could become unbalanced and fall
when removed from the machine.
13 Attach a lifting strap from an overhead 5 ton /
5,000 kg capacity crane to the platform end of
the primary boom for support. Do not lift it.
14 Remove all hose and cable clamps from the
underside of the primary boom.
15 Support the rod end of the primary boom lift
cylinder with a suitable lifting device.
16 Remove the pin retaining fasteners from the
primary boom lift cylinder rod-end pivot pin. Do
not remove the pin.
17 Raise the primary boom slightly with the
overhead crane to relieve the pressure on the
primary boom lift cylinder rod-end pivot pin.
18 Use a soft metal drift to remove the primary
boom lift cylinder rod-end pivot pin.
Crushing hazard. The primary
boom lift cylinder could become
unbalanced and fall if not properly
supported by the lifting device.
19 Lower the rod end of the primary boom lift
cylinder approximately 12 inches / 30 cm.
20 Pull all of the hoses and cables out and away
from the mounting ears for the rod end of the
primary boom lift cylinder.
21 Raise the rod end of the primary boom lift
cylinder back into position and install the rod-
end pivot pin. Install the pin retaining fasteners.
22 Attach a strap from an overhead crane to the
cable track.
23 Remove the mounting fasteners from the upper
cable track at the platform end of the extension
boom.
24 Remove the cable track mounting fasteners that
attach the lower cable track to the primary
boom.
25 Remove the cable track from the machine and
place it on a structure capable of supporting it.
Crushing hazard. The cable track
could become unbalanced and fall
if not properly attached to the
overhead crane.
Component damage hazard.
Cables and hoses can be damaged
if they are kinked or pinched.
PRIMARY BOOM COMPONENTS
Summary of Contents for Genie Z-45/25 Bi-Energy
Page 1: ......
Page 203: ...6 79 Section 6 Schematics September2015 Engine Panel Wiring Diagram 6 80 ...
Page 206: ...6 82 September2015 Section 6 Schematics Power Panel Wiring Diagram 6 81 ...
Page 207: ...6 83 Section 6 Schematics September2015 6 84 CTE Option Wiring Diagram CE ...
Page 210: ...6 86 September2015 Section 6 Schematics 6 85 Charger Interlock Option ...
Page 212: ...6 88 September2015 Section 6 Schematics Hydraulic Schematic 6 87 ...
Page 213: ......