Part No. 237062
Z-45/25 Bi-Energy • Z-45/25J Bi-Energy
3 - 37
September 2015
Section 3 • Scheduled Maintenance Procedures
Confirm the setting:
5 Turn the key switch to platform control.
6 Lift the test weight off the platform floor using a
suitable lifting device.
7 Place the test weight back onto the center of the
platform floor using a suitable lifting device.
Result: The alarm should be off. The platform
overload indicator light should be off at both the
ground and platform controls.
Note: There may be an approximate 2 second delay
before the overload indicator light and alarm turn
off.
8 Add an additional 10 lb / 4.5 kg test weight to
the original test weight to overload the platform.
Result: The alarm should be sounding.
The platform overload indicator light should be
flashing at both the ground and platform
controls.
Note: There may be an approximate 2 second delay
before the overload indicator light turns on and the
alarm sounds.
9 Test all machine functions from the platform
controls.
Result: All platform control functions should not
operate.
CHECKLIST
D
PROCEDURES
10 Turn the key switch to ground control.
11 Test all machine functions from the ground
controls.
Result: All ground control functions should not
operate.
Note: If the platform overload system is not
operating properly, repeat steps 1 through 4.
Summary of Contents for Genie Z-45/25 Bi-Energy
Page 1: ......
Page 203: ...6 79 Section 6 Schematics September2015 Engine Panel Wiring Diagram 6 80 ...
Page 206: ...6 82 September2015 Section 6 Schematics Power Panel Wiring Diagram 6 81 ...
Page 207: ...6 83 Section 6 Schematics September2015 6 84 CTE Option Wiring Diagram CE ...
Page 210: ...6 86 September2015 Section 6 Schematics 6 85 Charger Interlock Option ...
Page 212: ...6 88 September2015 Section 6 Schematics Hydraulic Schematic 6 87 ...
Page 213: ......