3
ã
Terberg Machines B.V. IJsselstein, The Netherlands
All rights reserved. No part of this book may be reproduced, stored in database or retrieval system, or published, in any form or in any way,
electronically, mechanically, by print, photoprint, microfilm or any other means without prior written permission from the publisher.
Foreword
This user manual provides information about the
operation and maintenance of the
Omni
DEL ( e)
bin lift system.
In order to work safely and efficiently with this auto-
matic bin lift system, it is essential that you read this
manual carefully before putting the bin lift into use.
Make the user manual available to everyone con-
cerned with the operation and/or the maintenance
of the bin lift.
Where necessary, refer to the user manual of the
refuse collection vehicle and the refuse handling
body.
When all the operating and maintenance instructions
have been met the bin lift can be safely used.
Should you nonetheless have any further questions,
please get in touch with your distributor.
Guarantee
For more information about the conditions of guar-
antee, please contact your distributor.
Operator requirements
- The bin lift system may only be operated by per-
sons who are familiar with the operation of the bin
lift.
- Repairs may only be carried out by qualified per-
sonnel.
Symbols used
NOTE:
Additional information.
CAUTION:
If these instructions are not followed, this
may result in slight to average injury and/or
damage to the product or the environment.
WARNING:
If these instructions are not followed, this
may result in serious or fatal injury and/or
serious damage to the product or the
environment.
The user manual has the following sections:
Introduction
A description of the function, conditions of use and
the operating principle of the machine.
Safety
Description of the safety provisions and the mea-
sures that need to be taken into account in order to
work safely with the machine. As well as an explana-
tion of the symbols on the machine.
Transport and storage
Information about the weight, the centre of gravity
and how to store the machine.
Installation and commissioning
A description of the installation and dimensions for
the machine when being built onto the RCV (Refuse
Collection Vehicle), including a list of tooling required
to conduct the installation.
Operating
A clear description of the important components
and instructions for emptying various types of bins.
Maintenance and cleaning
Describes all regular actions necessary for good
functioning of the machine.
Decommissioning
Description of the actions necessary to dismantle the
machine safely and to dispose of this in an environ-
mentally-friendly manner.
Appendices:
-
Electrical connections and components
-
Hydraulic connections and components
-
Special tools
-
Trouble shooting
-
Spare parts book