21
ã
Terberg Machines B.V. IJsselstein, The Netherlands
All rights reserved. No part of this book may be reproduced, stored in database or retrieval system, or published, in any form or in any way,
electronically, mechanically, by print, photoprint, microfilm or any other means without prior written permission from the publisher.
- Fit the main switch as close as possible to the battery with a maximum of 1 metre from the battery.
- Make the electrical connections as shown in the wiring diagram below.
ON
OFF
Mai
n ba
tter
y
swi
tch
bin-
lift
Pow
er to
bin
-lift
whe
n gr
een
ligh
t ON
Not
e!
If gr
een
ligh
t is
not
lit:
1. T
urn
swit
ch t
o O
N
2.M
ake
sur
e th
e re
fuse
bod
y is
tu
rned
on
and
the
Em
erge
ncy
st
op s
yste
m is
in w
orki
ng s
tate
3. C
hec
k th
e fu
se i
nsid
e
Zek
erin
g in
kas
t
Fus
e in
side
box
Fus
ible
en
boît
ier
Sich
erun
g in
Ge
häu
se
Maximum
1 metre
Battery
Main switch
Truck
37501 Connection set
In order to comply with international safety
standards the bin lift main power shut off
control box must be connected to the body
emergency stop system circuit.
If the lorry has a main switch the electrical
connection must be made after the main
switch.
The connection points for the +24 V and the
earth are usually shown in the instructions
provided by the lorry manufacture for fitting
bodywork.