23
ã
Terberg Machines B.V. IJsselstein, The Netherlands
All rights reserved. No part of this book may be reproduced, stored in database or retrieval system, or published, in any form or in any way,
electronically, mechanically, by print, photoprint, microfilm or any other means without prior written permission from the publisher.
5. Operating
5.1 Important components
3
3
4
4
5
5
6
6
7
8
9
10
12
10
11
8
2
1
13
13
A
B
10060
10067
37722
A
B
10060
10067
10353
50%
100%
A
B
29019
37720
10059
29018
10353
A
B
10060
10067
37722
A
B
10060
10067
10353
50%
100%
A
B
29019
37720
10059
29018
10353
2*
1*
1. 8 Position button control
station R/H*
2. 8 Position button control
station L/H*
3. Safety arm
4. Startsensor
5. Pick-up comb
6. Bin security switch
7. Hopper plate
8. Emergency stop
9. Catcherbar / Lid opener
10. Bin guide plate
11. Sensor 4-wheel container
recognition
12. Diagnostic System*
13. Light screen (option)
DIN pick-up arms can
also be fitted as an option.
2a
Push button travel height
2b
Dark green push button semi-automatic
4-wheel (option)
2c
Green indicator light automatic
2d
Light green push button automatic
2e
Push button catcherbar / lid opener
(with indication LED)
2f
Push button 2-wheel bins / 4-wheel
containers (with indication LED)
2g
Light blue push button UP left and
LIFTING 4-wheel containers**
2h
Dark blue push button DOWN left
and LOWERING 4-wheel containers**
1a
Push button travel height
1b
Dark green push button semi-automatic
4-wheel (option)
1c
Green indicator light automatic
1d
Light green push button automatic
1e
Shake selector switch
1f
Selector switch PCDC (option)
1g
Light blue push button UP right and
LIFTING 4-wheel containers**
1h
Dark blue push button DOWN right
and LOWERING 4-wheel containers**
a
b
c
d
e
f
g
h
a
b
c
d
e
f
g
h
A complete overview of
the different 8-position
control stations is given
in the Spare parts book.
** Once a 4-wheel cycle has started it can not be taken over with the other control station.
* Depending on the country: - The L/H and R/H control stations are interchanged.
- The Diagnostic System is placed on the L/H or R/H side of the bin lift.