24
T500 9015504 01-2018
MAINTENANCE
MAINTENANCE
13
14
6
4
1
3
1
7
14
14
12
10
15
9
11
8
5
2
MAINTENANCE CHART
The table below indicates the Person Responsible
for each procedure.
O = Operator T = Trained Personnel
Interval
Person
Resp.
Key
Description
Procedure
Daily
O
1
Pads
Check, fl ip, or replace
O
1
Brushes
Check, clean
O
2
Cylindrical brushes
Check, clean
O
3
Recovery tank
Drain, rinse, clean fl oat shut-off screen and
debris tray
O
4
Solution tank
Drain, rinse
O
5
Severe environment tank (option)
Check, refi ll
O
6
Automatic battery watering tank (option)
Check, refi ll
O
7
Squeegee
Clean, check for damage and wear
O
8
Batteries
Charge if necessary
O
9
Debris trough
Clean
O
10
Scrub head skirt
Check for damage and wear
Weekly
O
8
Battery cells
Check electrolyte level
O
7
Squeegee assembly drip trap reservoir
Check, clean
50 Hours
O
2
Cylindrical brushes
Rotate brushes. Check for wear
O
2
Cylindrical scrub head
Clean underside of scrub head
O
3
Recovery tank lid seal
Check for wear.
O
11
Solution tank fi lter
Remove and clean
100 Hours
O
8
Battery watering system (option)
Check hoses for damage and wear
200 Hours
O
8
Batteries, terminals and cables
Check and clean
750 Hours
T
12
Vacuum motor
Replace carbon brushes
1250 Hours
T
13
Propel motor
Replace carbon brushes
T
14
Brush motor
Replace carbon brushes
T
15
Brush belt
Replace belt
Summary of Contents for t500
Page 5: ...5 T500 9015504 01 2018 CONTENTS ...
Page 55: ...55 T500 9015504 01 2018 TROUBLESHOOTING ...
Page 89: ...89 T500 9015504 01 2018 SERVICE 9 Cycle the key switch to save selections ...
Page 111: ...111 T500 9015504 01 2018 SERVICE ...
Page 117: ...117 T500 9015504 01 2018 SERVICE ...
Page 146: ...146 T500 9015504 01 2018 SERVICE ...