QUICKSTART
The following procedures are the minimum
required to start and operate the
SWO. If you are concerned
regarding the Commissioning of the unit
please read the complete manual or call
your closest Techsys Corporation
representative.
The following test confirms the operational
directions of all pumps in both Manual and
Automatic Modes
ROTATION CHECK
This is a most important procedure and should be completed prior to any other
commissioning procedure.
Only Qualified Personnel should be allowed to complete this procedure as there is
High Voltage wiring within the switchboard.
1.
Switch OFF all motor circuit breakers in the cabinet.
2.
Turn ON power to Sowrdfish controller.
3.
Make sure all Pump Mode indicators are OFF. If not press the “P” key to turn
pump off (All pumps should be off)
4.
Adjust Overloads to to suit motor ratings. Switch ON all circuit breakers in the
cabinet.
5.
Press “P1” to turn on Pump 1. The Running indicator will light up.
(If the message “ Key Pad Locked” appears, scroll up to the Access Code using the up key
and input the number 21)
Check Rotation against the pump manufacturer
’s direction arrow. After
checking turn Pump1 to OFF by pressing “P1” again.
6.
Check the balance of the pumps for direction as descibed above.
If any of the other pumps have the wrong direction of rotation change two of
the wires on the wiring connected to the motor in question.
•
Re-check direction
7.
Rotation check complete.
1
2
1
1
9
8
7
6
5
4
3
Swor dfish+
M ult i Pump
Fixed Speed
Cont r ol Syst em
2
1
Input Indicators
Techsys
Cor por at ion
Access to Qualified Personnel Only