
96
・All specifications are subject to change without notice.
Instruction Manual
HWS
HWS HD
HWS ME
HWS-P
Remote ON/OFF control required
① Remove standard attached connector, and use the harness
made by the customer and connect external signal to be-
tween CNT and TOG terminal.
② TOG terminal is ground for CNT terminal.
In case this function is not used, please short between CNT
and TOG terminal.
PF signal output required
① PF signal is an open collector output, therefore PF signal
outputs is shown in circuit below.
② TOG terminal is ground for PF terminal.
Connecting circuit with CN01 or CN02 connector
Connecting circuit with CN01 or CN02 connector
NAMEPLATE
M8 Bolts and nuts for
connecting to the load line
(These are not attached to
the product.)
Connector : (JST) S12B-PHDSS
Remove standard attached connector, and
use the harness made by the customer.
・Housing : (JST) PHDR-12VS
・Contact : (JST) SPHD-001T-P0.5
1−2, 3−4, 7−8:should be shorted
9:CNT
Should be connected to ON/OFF control signal.
10:TOG
Should be connected to Signal Ground.
*Please use wire for contact and crimping
tool specified by maker.
Load
ー
+
NAMEPLATE
M8 Bolts and nuts for
connecting to the load line
(These are not attached to
the product.)
Connector : (JST) S12B-PHDSS
Remove standard attached connector, and use
the harness made by the customer.
・Housing : (JST) PHDR-12VS
・Contact : (JST) SPHD-001T-P0.5
1−2, 3−4, 7−8, 9−10:should be shorted.
11:PF
Should be connected to PF signal output
12:TOG
Should be connected to Signal Ground.
*Please use wire for contact and crimping tool
specified by maker.
Load
ー
+
1
3
5
7
9
11
2
4
6
8
12
1
3
5
7
9
11
2
4
6
8
10
12
ON
10
PF signal output
To signal ground
HWS
1000
P79-132.indd 96
09.10.26 10:29:24 AM
Summary of Contents for HWS?HWS
Page 1: ...HWS Series AC DC Switching Power Supply HWS HWS ME HWS HD HWS P...
Page 30: ......
Page 68: ......