5-36
MAINTENANCE
EVERY 50 HOURS
1. Remove the bolts (a) and open the
radiator (b).
2. Remove the R-pin (e) from the stay (c).
3. Insert the stay (c) into the hole (d) to
secure the radiator (b).
4. Remove the negative terminal (1) from the
battery.
5. Remove the positive terminal (2) from the
battery.
6. Remove the double nut (3), and then
remove the battery cover (4) and the
battery clamp (5).
7. Remove the battery.
8. Remove any combustibles such as twigs,
dead leaves, oil and grease from the area
where the battery (6) was installed.
9. Install the battery (6) to the machine.
10. Install the battery cover (4) and the
battery clamp (5), and then secure them
with the double nut (3).
Double nut (3) tightening torque:
Lower nut, 2 N·m
Upper nut, 8 N·m
11. Install the positive terminal (2) to the
battery.
Removing any combustibles
12. Install the negative terminal (1) to the
battery.
13. Restore the radiator, and then close the
rear door.
Summary of Contents for TL8
Page 1: ......
Page 7: ...0 5...
Page 12: ...0 10...
Page 13: ...1 1 SAFETY...
Page 55: ...1 43 SAFETY SAFETY SIGNS DECALS With Lift arm lower button TL10 TL12...
Page 56: ...1 44 SAFETY SAFETY SIGNS DECALS...
Page 57: ...1 45 SAFETY SAFETY SIGNS DECALS...
Page 58: ...1 46 SAFETY SAFETY SIGNS DECALS...
Page 59: ...2 1 CONTROLS...
Page 113: ...3 1 OPERATION...
Page 119: ...3 7 MEMO...
Page 143: ...4 1 TRANSPORT...
Page 148: ...4 6...
Page 149: ...5 1 MAINTENANCE...
Page 211: ...6 1 TROUBLESHOOTING...
Page 234: ...6 24...
Page 235: ...7 1 SPECIFICATIONS...
Page 239: ...7 5 MEMO...
Page 240: ...7 6 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS...
Page 243: ...7 9 MEMO...
Page 244: ...7 10 SPECIFICATIONS OPERATING RANGES OPERATING RANGES...
Page 246: ...7 12...
Page 247: ...8 1 OPTIONS...
Page 261: ...8 15...