![Takeuchi TL8 Operator'S Manual Download Page 135](http://html1.mh-extra.com/html/takeuchi/tl8/tl8_operators-manual_3340166135.webp)
3-23
OPERATION
Raise the lift arms and tilt the bucket forward, then release it as the machine is driven forward.
Next tilt the bucket forward and lower the front edge until it is slightly above the ground
surface, then back the machine over the load that was just released.
Backfilling
With the bucket lowered, drive near the hole and tilt the front edge of the bucket downward as
soon as it passes over the near side of the hole. Raise the bucket and empty the load only
when necessary.
Leveling
OPERATING PROCEDURES
Summary of Contents for TL8
Page 1: ......
Page 7: ...0 5...
Page 12: ...0 10...
Page 13: ...1 1 SAFETY...
Page 55: ...1 43 SAFETY SAFETY SIGNS DECALS With Lift arm lower button TL10 TL12...
Page 56: ...1 44 SAFETY SAFETY SIGNS DECALS...
Page 57: ...1 45 SAFETY SAFETY SIGNS DECALS...
Page 58: ...1 46 SAFETY SAFETY SIGNS DECALS...
Page 59: ...2 1 CONTROLS...
Page 113: ...3 1 OPERATION...
Page 119: ...3 7 MEMO...
Page 143: ...4 1 TRANSPORT...
Page 148: ...4 6...
Page 149: ...5 1 MAINTENANCE...
Page 211: ...6 1 TROUBLESHOOTING...
Page 234: ...6 24...
Page 235: ...7 1 SPECIFICATIONS...
Page 239: ...7 5 MEMO...
Page 240: ...7 6 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS...
Page 243: ...7 9 MEMO...
Page 244: ...7 10 SPECIFICATIONS OPERATING RANGES OPERATING RANGES...
Page 246: ...7 12...
Page 247: ...8 1 OPTIONS...
Page 261: ...8 15...