3-24
OPERATION
Lower the bucket to the ground before setting the lift arms to the float mode. Tilt the bucket
forward to stand it on its cutting edge, and then level the loose ground while driving in reverse.
Loading
OPERATING PROCEDURES
Move the machine, stop close to the truck, and then raise the bucket until its lower edge is
well above the truck bed. Slowly move the machine forward and stop at the position where the
bucket is to dump. Tilt the bucket forward to release the material in the bucket into the truck
bed. When the truck bed is filled to half capacity, use the bucket to spread the load evenly.
Leveling Operation using the Float position
• Make sure the bucket is lowered to the ground before floating the lift arms. Floating
the lift arms while they are raised will cause the bucket to fall rapidly and is
dangerous.
• Do not travel forward with the lift arms in the float position.
Summary of Contents for TL8
Page 1: ......
Page 7: ...0 5...
Page 12: ...0 10...
Page 13: ...1 1 SAFETY...
Page 55: ...1 43 SAFETY SAFETY SIGNS DECALS With Lift arm lower button TL10 TL12...
Page 56: ...1 44 SAFETY SAFETY SIGNS DECALS...
Page 57: ...1 45 SAFETY SAFETY SIGNS DECALS...
Page 58: ...1 46 SAFETY SAFETY SIGNS DECALS...
Page 59: ...2 1 CONTROLS...
Page 113: ...3 1 OPERATION...
Page 119: ...3 7 MEMO...
Page 143: ...4 1 TRANSPORT...
Page 148: ...4 6...
Page 149: ...5 1 MAINTENANCE...
Page 211: ...6 1 TROUBLESHOOTING...
Page 234: ...6 24...
Page 235: ...7 1 SPECIFICATIONS...
Page 239: ...7 5 MEMO...
Page 240: ...7 6 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS...
Page 243: ...7 9 MEMO...
Page 244: ...7 10 SPECIFICATIONS OPERATING RANGES OPERATING RANGES...
Page 246: ...7 12...
Page 247: ...8 1 OPTIONS...
Page 261: ...8 15...