![background image](http://html1.mh-extra.com/html/takeuchi/tl8/tl8_operators-manual_3340166123.webp)
3-11
OPERATION
Warm-up in cold climates
1. Perform the normal warm-up procedure.
2. Set the bucket cylinder at the stroke end
and keep it there.
Do not keep this condition for more than
30 seconds.
3. Repeat Step 2 until the bucket operating
speed becomes normal.
INSPECTION AFTER WARM-UP
After warming up the engine and machine
(hydraulic oil), perform the checks and
inspections described below, and repair if
necessary.
OPERATING THE MACHINE
1. Check that the warning lamps and meters
are as follows:
· Are all warning lamps off?
· Is the indicator on water temperature
gauge seen within the green range?
2. Check that there are no irregularities in the
exhaust color, sound and vibrations.
3. Raise the safety bar to the locked position,
and then check that the control levers are
locked.
Summary of Contents for TL8
Page 1: ......
Page 7: ...0 5...
Page 12: ...0 10...
Page 13: ...1 1 SAFETY...
Page 55: ...1 43 SAFETY SAFETY SIGNS DECALS With Lift arm lower button TL10 TL12...
Page 56: ...1 44 SAFETY SAFETY SIGNS DECALS...
Page 57: ...1 45 SAFETY SAFETY SIGNS DECALS...
Page 58: ...1 46 SAFETY SAFETY SIGNS DECALS...
Page 59: ...2 1 CONTROLS...
Page 113: ...3 1 OPERATION...
Page 119: ...3 7 MEMO...
Page 143: ...4 1 TRANSPORT...
Page 148: ...4 6...
Page 149: ...5 1 MAINTENANCE...
Page 211: ...6 1 TROUBLESHOOTING...
Page 234: ...6 24...
Page 235: ...7 1 SPECIFICATIONS...
Page 239: ...7 5 MEMO...
Page 240: ...7 6 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS...
Page 243: ...7 9 MEMO...
Page 244: ...7 10 SPECIFICATIONS OPERATING RANGES OPERATING RANGES...
Page 246: ...7 12...
Page 247: ...8 1 OPTIONS...
Page 261: ...8 15...