5-59
MAINTENANCE
EVERY 1000 HOURS
3. Place a pan for catching the waste coolant
under the drain plug (4), and then loosen
the drain plug (4) to drain the coolant.
4. Tighten the drain plug (4).
5. Add tap water to the radiator through the
coolant fill port up to the top of the port.
Take time and slowly add water, so that no
air enters the radiator.
6. Close the radiator cap (3).
7. Start the engine and run it at a speed
slightly above low idling. Raise the water
temperature to at least 90°C (194°F), and
then run the engine for about 10 minutes
with the thermostat open.
8. Stop the engine, wait until the cooling
water temperature becomes lower, and
then remove the drain plug (4) to drain the
water.
9. After draining, clean the cooling system
using a cleaning agent. When using the
cleaning agent, follow the instructions
included with the agent.
10. Repeat the steps 5 to 9 to rinse the
cooling system.
11. Tighten the drain plug (4).
12. Take time and slowly add the new
coolant (mixture of antifreeze and tap
water) to the radiator through the fill port
until it is full.
13. Close the radiator cap (3).
14. Warm up the engine. Use the meters to
check that there are no irregularities in
the cooling system at this time.
15. Increase the water temperature to at
least 90°C (194°F). Then, run the engine
for about 10 minutes with the thermostat
kept open.
16. Stop the engine, wait until the cooling
water temperature becomes lower, and
then check the level of coolant in the
radiator.
If necessary, add cooling water until the
radiator is full.
17. Close the radiator cap (3) and the cover
(5).
18. Clean the interior of the reserve tank (1),
and then add coolant to the upper limit
(H).
19. When the coolant has been replaced,
inspect the coolant level once again after
operating the machine.
Once the machine is operated, the
coolant is distributed throughout the
entire system, resulting in the lower
coolant level.
Replenish the cooling water that has
been used.
Summary of Contents for TB295W
Page 1: ......
Page 11: ...1 1 SAFETY...
Page 50: ...1 40 SAFETY SAFETY SIGNS DECALS...
Page 51: ...1 41 SAFETY SAFETY SIGNS DECALS...
Page 52: ...1 42 SAFETY SAFETY SIGNS DECALS...
Page 53: ...2 1 CONTROLS...
Page 77: ...2 25 MEMO...
Page 126: ...2 74...
Page 127: ...3 1 OPERATION...
Page 155: ...3 29 MEMO...
Page 158: ...3 32...
Page 159: ...4 1 TRANSPORT...
Page 163: ...4 5 TRANSPORT Hoisting posture HOISTING THE MACHINE...
Page 166: ...4 8...
Page 167: ...5 1 MAINTENANCE...
Page 217: ...5 51 MEMO...
Page 229: ...5 63 MEMO...
Page 235: ...5 69 MEMO...
Page 246: ...5 80...
Page 247: ...6 1 TROUBLESHOOTING...
Page 255: ...6 9 MEMO...
Page 271: ...7 1 SPECIFICATIONS...
Page 278: ...7 8 SPECIFICATIONS OPERATING RANGES OPERATING RANGES...
Page 280: ...7 10 MEMO...
Page 282: ...7 12 SPECIFICATIONS 2 Piece boom LIFTING CAPACITIES...
Page 283: ...7 13 SPECIFICATIONS 2 Piece boom LIFTING CAPACITIES...
Page 284: ...7 14 SPECIFICATIONS Mono boom LIFTING CAPACITIES...
Page 285: ...7 15 SPECIFICATIONS Mono boom LIFTING CAPACITIES...
Page 286: ...7 16...
Page 287: ...8 1 OPTIONS...
Page 303: ...8 17...