3-10
OPERATION
OPERATING THE MACHINE
INSPECTION AFTER WARM-UP
After warming up the engine and machine
(hydraulic oil), perform the checks and
inspections described below, and repair if
necessary.
1. Check that the warning lamps and meters
are as follows:
· Are all warning lamps off?
· Is the water temperature level within the
green range?
2. Check that there are no irregularities in the
exhaust color, sound and vibrations.
3. Raise the safety lock lever to the locked
position, and then check that the
operating and travel levers are locked.
TRAVELING THE MACHINE
• Before traveling, set the machine to the
“travel posture”.
Refer to “Preparing for travel” for further
details.
• When traveling on a road, be sure to
lock the working equipment. If any of
the controls is accidentally touched
when it is unlocked, the machine may
suddenly move and cause serious injury
or death.
• Keep in mind that the steering wheel
operation is not possible when the
engine is stopped or if the steering
pump becomes faulty.
• When traveling on a public road, be sure
to lock slewing/swinging with the slew/
swing lock pin. For machines with
outriggers, retract the outriggers and
install the stoppers.
Summary of Contents for TB295W
Page 1: ......
Page 11: ...1 1 SAFETY...
Page 50: ...1 40 SAFETY SAFETY SIGNS DECALS...
Page 51: ...1 41 SAFETY SAFETY SIGNS DECALS...
Page 52: ...1 42 SAFETY SAFETY SIGNS DECALS...
Page 53: ...2 1 CONTROLS...
Page 77: ...2 25 MEMO...
Page 126: ...2 74...
Page 127: ...3 1 OPERATION...
Page 155: ...3 29 MEMO...
Page 158: ...3 32...
Page 159: ...4 1 TRANSPORT...
Page 163: ...4 5 TRANSPORT Hoisting posture HOISTING THE MACHINE...
Page 166: ...4 8...
Page 167: ...5 1 MAINTENANCE...
Page 217: ...5 51 MEMO...
Page 229: ...5 63 MEMO...
Page 235: ...5 69 MEMO...
Page 246: ...5 80...
Page 247: ...6 1 TROUBLESHOOTING...
Page 255: ...6 9 MEMO...
Page 271: ...7 1 SPECIFICATIONS...
Page 278: ...7 8 SPECIFICATIONS OPERATING RANGES OPERATING RANGES...
Page 280: ...7 10 MEMO...
Page 282: ...7 12 SPECIFICATIONS 2 Piece boom LIFTING CAPACITIES...
Page 283: ...7 13 SPECIFICATIONS 2 Piece boom LIFTING CAPACITIES...
Page 284: ...7 14 SPECIFICATIONS Mono boom LIFTING CAPACITIES...
Page 285: ...7 15 SPECIFICATIONS Mono boom LIFTING CAPACITIES...
Page 286: ...7 16...
Page 287: ...8 1 OPTIONS...
Page 303: ...8 17...