3-7
OPERATION
LEVER PATTERN (G PATTERN) (IF EQUIPPED)
• Before starting operation, carefully check which lever pattern you are going to use.
• It is described using the ISO pattern in this manual.
Brake
Forward Travel
Reverse Travel
Boom Lower
Arm Out
Boom Raise
Arm In
Upperstructure Slew Left
Bucket Load
Upperstructure Slew Right
Bucket Dump
Boom Swing Left
Second Boom Raise
(2-piece boom)
Boom Swing Right
Second Boom Lower
(2-piece boom)
Outrigger Lower
Dozer Blade Lower
Outrigger Raise
Dozer Blade Raise
OPERATING THE MACHINE
Summary of Contents for TB295W
Page 1: ......
Page 11: ...1 1 SAFETY...
Page 50: ...1 40 SAFETY SAFETY SIGNS DECALS...
Page 51: ...1 41 SAFETY SAFETY SIGNS DECALS...
Page 52: ...1 42 SAFETY SAFETY SIGNS DECALS...
Page 53: ...2 1 CONTROLS...
Page 77: ...2 25 MEMO...
Page 126: ...2 74...
Page 127: ...3 1 OPERATION...
Page 155: ...3 29 MEMO...
Page 158: ...3 32...
Page 159: ...4 1 TRANSPORT...
Page 163: ...4 5 TRANSPORT Hoisting posture HOISTING THE MACHINE...
Page 166: ...4 8...
Page 167: ...5 1 MAINTENANCE...
Page 217: ...5 51 MEMO...
Page 229: ...5 63 MEMO...
Page 235: ...5 69 MEMO...
Page 246: ...5 80...
Page 247: ...6 1 TROUBLESHOOTING...
Page 255: ...6 9 MEMO...
Page 271: ...7 1 SPECIFICATIONS...
Page 278: ...7 8 SPECIFICATIONS OPERATING RANGES OPERATING RANGES...
Page 280: ...7 10 MEMO...
Page 282: ...7 12 SPECIFICATIONS 2 Piece boom LIFTING CAPACITIES...
Page 283: ...7 13 SPECIFICATIONS 2 Piece boom LIFTING CAPACITIES...
Page 284: ...7 14 SPECIFICATIONS Mono boom LIFTING CAPACITIES...
Page 285: ...7 15 SPECIFICATIONS Mono boom LIFTING CAPACITIES...
Page 286: ...7 16...
Page 287: ...8 1 OPTIONS...
Page 303: ...8 17...