0-3
FRONT, REAR, LEFT AND RIGHT
MACHINE DESCRIPTION
Equipped with outrigger
DESIGNATED OPERATIONS
Use this machine primarily for the following
operations:
• Excavation
• Digging ditches
• Digging side ditches
• Leveling
• Loading
FEATURES
• Adopting the auto-idle enables less fuel
consumption
• Engine emergency stop system
• Electronic control of auxiliary hydraulic
circuit
• Equipping the auxiliary 1st and 2nd lines
with a flow rate control mechanism
• Configuring the auxiliaries of 2nd, 3rd
(high-pressure type) and 4th.
• Legible instrument cluster with a 5-inch
color LCD
• Installing the ROPS certified large cab (with
front sash assist)
• Hydromounted cab minimizes vibration
• Low engine noise and exhaust emissions
• Adopting the larger engine hood and right
side cover allows easier maintenance
BREAK-IN PERIOD
When the machine is new, operate the
machine for the first 100 hours (as indicated
on the hour meter) by following the
instructions below.
Using a new machine without a break-in
period will lead to quicker deterioration of
machine performance and may shorten the
machine’s service life.
• Sufficiently warm up the engine and
hydraulic oil.
• Avoid heavy loads and rapid operations.
Operate with a load of about 80% the
maximum load.
• Do not abruptly start up, accelerate,
change directions, or stop unless
necessary.
This manual refers the front, rear, left and
right of the machine as seen when sitting in
the operator’s seat with the steering device
visible to the front.
Summary of Contents for TB295W
Page 1: ......
Page 11: ...1 1 SAFETY...
Page 50: ...1 40 SAFETY SAFETY SIGNS DECALS...
Page 51: ...1 41 SAFETY SAFETY SIGNS DECALS...
Page 52: ...1 42 SAFETY SAFETY SIGNS DECALS...
Page 53: ...2 1 CONTROLS...
Page 77: ...2 25 MEMO...
Page 126: ...2 74...
Page 127: ...3 1 OPERATION...
Page 155: ...3 29 MEMO...
Page 158: ...3 32...
Page 159: ...4 1 TRANSPORT...
Page 163: ...4 5 TRANSPORT Hoisting posture HOISTING THE MACHINE...
Page 166: ...4 8...
Page 167: ...5 1 MAINTENANCE...
Page 217: ...5 51 MEMO...
Page 229: ...5 63 MEMO...
Page 235: ...5 69 MEMO...
Page 246: ...5 80...
Page 247: ...6 1 TROUBLESHOOTING...
Page 255: ...6 9 MEMO...
Page 271: ...7 1 SPECIFICATIONS...
Page 278: ...7 8 SPECIFICATIONS OPERATING RANGES OPERATING RANGES...
Page 280: ...7 10 MEMO...
Page 282: ...7 12 SPECIFICATIONS 2 Piece boom LIFTING CAPACITIES...
Page 283: ...7 13 SPECIFICATIONS 2 Piece boom LIFTING CAPACITIES...
Page 284: ...7 14 SPECIFICATIONS Mono boom LIFTING CAPACITIES...
Page 285: ...7 15 SPECIFICATIONS Mono boom LIFTING CAPACITIES...
Page 286: ...7 16...
Page 287: ...8 1 OPTIONS...
Page 303: ...8 17...