![Takeuchi TB295W Operator'S Manual Download Page 242](http://html1.mh-extra.com/html/takeuchi/tb295w/tb295w_operators-manual_3349166242.webp)
5-76
MAINTENANCE
WHEN REQUIRED
DRAINING THE WATER FROM THE
WATER SEPARATOR
• Do not smoke or permit open flames
while handling fuel or working on the
fuel system.
• Stop the engine in a well-ventilated
place and allow it to cool down before
performing maintenance.
• Clean up spilled fuel immediately.
• Before performing maintenance on top
of the work bench, clean the footing and
observe the following precautions to
prevent falling.
· Do not spill oil or grease.
· Do not leave tools scattered around.
· Watch your step when walking.
• Never jump down from the machine or
the work bench. When getting on or off
the machine or work bench, use the
steps, handrails or work bench to
support your body. Your weight should
be evenly distributed among the three
contact points (one hand and two feet
or two hands and one foot).
• Do not stand on the dozer blade and
perform maintenance work. Doing so is
dangerous because of the unsteady
foothold. Use the work bench.
1. Open the right side cover.
2. Place a pan under the drain valve (1) to
catch fuel.
3. Open the drain valve (1) and drain the
water.
If the water does not drain easily, loosen
the plug (2).
4. Close the drain valve (1) and tighten the
plug (2).
Refer to “Bleeding air from the fuel system”
on page 6-8.
Summary of Contents for TB295W
Page 1: ......
Page 11: ...1 1 SAFETY...
Page 50: ...1 40 SAFETY SAFETY SIGNS DECALS...
Page 51: ...1 41 SAFETY SAFETY SIGNS DECALS...
Page 52: ...1 42 SAFETY SAFETY SIGNS DECALS...
Page 53: ...2 1 CONTROLS...
Page 77: ...2 25 MEMO...
Page 126: ...2 74...
Page 127: ...3 1 OPERATION...
Page 155: ...3 29 MEMO...
Page 158: ...3 32...
Page 159: ...4 1 TRANSPORT...
Page 163: ...4 5 TRANSPORT Hoisting posture HOISTING THE MACHINE...
Page 166: ...4 8...
Page 167: ...5 1 MAINTENANCE...
Page 217: ...5 51 MEMO...
Page 229: ...5 63 MEMO...
Page 235: ...5 69 MEMO...
Page 246: ...5 80...
Page 247: ...6 1 TROUBLESHOOTING...
Page 255: ...6 9 MEMO...
Page 271: ...7 1 SPECIFICATIONS...
Page 278: ...7 8 SPECIFICATIONS OPERATING RANGES OPERATING RANGES...
Page 280: ...7 10 MEMO...
Page 282: ...7 12 SPECIFICATIONS 2 Piece boom LIFTING CAPACITIES...
Page 283: ...7 13 SPECIFICATIONS 2 Piece boom LIFTING CAPACITIES...
Page 284: ...7 14 SPECIFICATIONS Mono boom LIFTING CAPACITIES...
Page 285: ...7 15 SPECIFICATIONS Mono boom LIFTING CAPACITIES...
Page 286: ...7 16...
Page 287: ...8 1 OPTIONS...
Page 303: ...8 17...