78
Replacing Modules
TB9100 Installation and Operation Manual
© Tait Electronics Limited May 2006
4.
Pull the control panel down
e
to disengage the center tab
f
from
the subrack.
Refitting
1.
Fit the top of the control panel to the subrack so that the center tab
is behind the lip of the subrack and between the two locating tabs
formed in the lip. Push the control panel firmly upwards
g
.
2.
Align the D-range socket on the back of the control panel with the
plug on the subrack. Gently push the bottom of the panel home
against the subrack
h
to engage the plug into the socket.
3.
Insert the securing screw into the floating nut
i
in the subrack and
tighten. Note that you may have to push the screw in and down to
pick up the floating nut.
4.
Carry out the instructions in
.
7.4
Replacing the Reciter
Removal
1.
If you have not already done so, carry out the instructions in
“Preliminary Disassembly” on page 75
, and remove the control
“Replacing the Control Panel” on page 77
2.
At the rear of the reciter, unplug the RF input cable
b
, any system
cables
c
and the external reference cable
d
(if fitted).
b
d
e
f
g
c
h
i
Summary of Contents for TB9100
Page 1: ...MBA 00002 05 Issue 5 May 2006 TB9100 base station Installation and Operation Manual...
Page 6: ...6 TB9100 Installation and Operation Manual Tait Electronics Limited May 2006 Glossary 131...
Page 26: ...26 Description TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Page 34: ...34 Maintenance TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Page 60: ...60 Installation TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Page 74: ...74 TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...