44
Installation
TB9100 Installation and Operation Manual
© Tait Electronics Limited May 2006
Connecting to a Calibration and Test Unit
If you have a TB9100 Calibration and Test Unit (CTU), connect it to the
base station as follows for testing base station operation:
Note
Refer to the Calibration Software online Help or User’s Manual
and to the Calibration and Test Unit Operation Manual for
detailed information about connecting and operating the CTU.
With this set up, you can carry out the following tasks to exercise the base
station.
Figure 4.3
TB9100 to CTU connections
b
Reciter rear
f
DC input connector
c
9-way digital I/O / serial connector
g
RJ-45
d
Ethernet RJ-45
h
9-way port (male)
e
Analog RJ-45 (audio)
i
3-wire cable (TXD,RXD,GRND)
Hub
CSS
10-32 VDC
Power
Supply
CTU
b
c
d
h
g
e
f
i
Summary of Contents for TB9100
Page 1: ...MBA 00002 05 Issue 5 May 2006 TB9100 base station Installation and Operation Manual...
Page 6: ...6 TB9100 Installation and Operation Manual Tait Electronics Limited May 2006 Glossary 131...
Page 26: ...26 Description TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Page 34: ...34 Maintenance TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Page 60: ...60 Installation TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Page 74: ...74 TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...