TB9100 Installation and Operation Manual
Technical Description
91
© Tait Electronics Limited May 2006
8
Technical Description
8.1
Mechanical Assembly
This section illustrates the main mechanical components that comprise the
TB9100 base station.
below shows the configuration for a typical
5 W or 50 W base station.
Note
shows the cooling fans and their ducts detached from
the front panel only for the clarity of the illustration. The cooling
fans and ducts are normally screwed to the rear of the front panel.
.
Figure 8.1
Mechanical assembly - front panel, fans and control panel
b
front panel
i
airflow separator
c
PMU fan
j
cable retaining clip
d
PA fan
1)
subrack
e
PMU fan duct
1!
reciter
f
PA fan duct
1@
plastic guide rail
g
PMU
1#
module retaining clamp
h
PA
1$
control panel
b
c
d
e
f
g
h
i
j
1)
1!
1@
1#
1$
5 or 50W base station shown
Summary of Contents for TB9100
Page 1: ...MBA 00002 05 Issue 5 May 2006 TB9100 base station Installation and Operation Manual...
Page 6: ...6 TB9100 Installation and Operation Manual Tait Electronics Limited May 2006 Glossary 131...
Page 26: ...26 Description TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Page 34: ...34 Maintenance TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Page 60: ...60 Installation TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Page 74: ...74 TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...