![Tait TB9100 Installation And Operation Manual Download Page 55](http://html1.mh-extra.com/html/tait/tb9100/tb9100_installation-and-operation-manual_3286704055.webp)
TB9100 Installation and Operation Manual
Installation
55
© Tait Electronics Limited May 2006
You must connect the DC supply from the battery to the PMU via a fuse or
DC-rated circuit breaker with the appropriate rating, as shown in the table
below. The DC input leads should be of a suitable gauge to ensure less than
0.2V drop at maximum load over the required length of lead.
Terminate and insulate the DC input leads so they are protected from
accidentally shorting to the subrack if the PMU is removed before the leads
are disconnected.
DC Power with 12 V
PA
The TB9100 12 V PA is designed to accept a nominal 12 VDC input with
negative ground. There is a minimum DC startup threshold to prevent
damaging a battery which has little capacity left.
You must connect the DC supply from the battery to the PA via a fuse or
DC-rated circuit breaker with the appropriate rating, as shown in the table
below. The DC input leads should be of a suitable gauge to ensure less than
0.2V drop at maximum load over the required length of lead.
Nominal Supply
Voltage
Input Voltage
Range
Circuit Breaker/
Fuse Rating
Recommended
Wire Gauge
a
a. For a length of 5ft to 6.5ft (1.5m to 2m) (typical).
12VDC
10VDC to 16.8VDC
60A
2AWG / 35mm
2
24VDC
20VDC to 33.6VDC
30A
5AWG / 16mm
2
48VDC
40VDC to 60VDC
15A
8AWG / 8mm
2
Figure 4.11
Recommended DC power connection
Nominal Supply
Voltage
Input Voltage
Range
Circuit Breaker/
Fuse Rating
Recommended
Wire Gauge
a
a. For a length of 5ft to 6.5ft (1.5m to 2m) (typical).
12VDC
10VDC to 16.8VDC
15A to 18A
8AWG / 8mm
2
Summary of Contents for TB9100
Page 1: ...MBA 00002 05 Issue 5 May 2006 TB9100 base station Installation and Operation Manual...
Page 6: ...6 TB9100 Installation and Operation Manual Tait Electronics Limited May 2006 Glossary 131...
Page 26: ...26 Description TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Page 34: ...34 Maintenance TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Page 60: ...60 Installation TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Page 74: ...74 TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...