TB9100 Installation and Operation Manual
Replacing Modules
89
© Tait Electronics Limited May 2006
1.
Before fitting the front panel, ensure that all cables are secured and
positioned correctly so they are clear of the fan ducts (refer to
and
). Otherwise the panel may not fit
properly, or you may damage the cables.
2.
Refit the Front Panel
a. Fit the front panel onto the locating pegs on the subrack. Fit the
left end first, followed by the right end, pressing the panel in the
center as shown
b
to secure the spring clip behind the control
panel.
b. Secure the fastener at each end
c
with a quarter turn clockwise.
Align the slot horizontally, then press the fastener in and turn to
lock.
Figure 7.3
Identifying the correct front panel
b
c
100W front panel:
the PA fan duct has cut-outs
but no break-off tab
5 or 50W front panel:
the PA fan duct has the break-
off tab but no cut-outs
Summary of Contents for TB9100
Page 1: ...MBA 00002 05 Issue 5 May 2006 TB9100 base station Installation and Operation Manual...
Page 6: ...6 TB9100 Installation and Operation Manual Tait Electronics Limited May 2006 Glossary 131...
Page 26: ...26 Description TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Page 34: ...34 Maintenance TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Page 60: ...60 Installation TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Page 74: ...74 TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...