PR4 - 2
WBPEEUI220772A0
Procedure
□
2. Move the work surface up to 6.35 millimeters (0.25 inches)
up, down, forward or back toward the cabinet to line up the
work surfaces.
□
3. Two steel alignment pins are shipped inside the brass
bushings located on each side of each work surface. When two
work surfaces are lined up, push the pins outward into the
bushing of the tabletop to the right of the cabinet.
□
4. Use the ½-inch open end wrench to tighten the six bolts.
Summary of Contents for C-I-CV43C
Page 1: ...Bailey Hartmann Braun TM Instruction Conductor Conductor VMS Series 43 Auxiliary Terminal...
Page 13: ...WBPEEUI220772A0...
Page 23: ...WBPEEUI220772A0...
Page 37: ...WBPEEUI220772A0...
Page 47: ...WBPEEUI220772A0...
Page 49: ...WBPEEUI220772A0...
Page 57: ...WBPEEUI220772A0...
Page 61: ...WBPEEUI220772A0...
Page 75: ...WBPEEUI220772A0...
Page 87: ...PR6 4 WBPEEUI220772A0 Procedure Figure PR6 3 CPU Input Voltage T00440A REAR OF CPU 230 V 115 V...
Page 93: ...WBPEEUI220772A0...
Page 103: ...WBPEEUI220772A0...
Page 109: ...WBPEEUI220772A0...
Page 117: ...WBPEEUI220772A0...
Page 121: ...WBPEEUI220772A0...
Page 123: ...WBPEEUI220772A0...
Page 125: ...WBPEEUI220772A0...
Page 129: ...WBPEEUI220772A0...
Page 131: ...PR25 2 WBPEEUI220772A0 Procedure Figure PR25 1 Multibus Card Cage T01448A FRONT VIEW SCREWS 4...
Page 139: ...PR28 4 WBPEEUI220772A0 Procedure Figure PR28 2 PEP Replacement T01308A FRONT VIEW SCREWS 5...
Page 151: ...WBPEEUI220772A0...
Page 153: ...WBPEEUI220772A0...
Page 159: ...WBPEEUI220772A0...
Page 169: ...WBPEEUI220772A0...
Page 173: ...WBPEEUI220772A0...