NetBackup 5020
Routine Maintenance
4 Guide to the Routine Maintenance Using the System
Monitor Interface
Issue 01 (2010-12-10)
Symantec Corporation
4-15
Step 2
Expand the node in the navigation tree, and then click
Power Supply
, as shown in
Figure 4-14
Power supply
option
Step 3
View the power supply status, as shown in
description.
ID-x indicates power supply x (the value of x is
1
or
2
).
Figure 4-15
Power supply status