Fixturing the Work
The work pieces must be properly prepared before fixturing.
See page 3-28 in Section 3,
Operation,
for information.
1.
Locate the centering gage. Turn the gage so the
labeled side is face up. Insert the gage into the fixture.
See Figure 4-11.
The orientation of the fixture does not matter.
2.
Open the fixture side facing the labeled side of
the centering gage by rotating the latch 90
°
.
See Figure 4-12.
The fixture opens with a scissors type action.
Figure 4-12 shows how to use the micro fixture
tool on both the Series 4 and Series 8 fixtures.
Figure 4-12 Insert First Work Piece
Opening the
Fixture
Note: Use the micro fixture tool for
Series 4 and Series 8 fixtures