
Installation
CWS
−
D100
−
B Welding System
2005 Swagelok Company, All right reserved
September 2005
2-14
Preliminary Check
Before placing the SWS into operation, you should check
that the power supply is operating correctly.
To check the system, follow these steps:
1.
Connect the power supply power cord to an
electrical outlet.
2.
Turn on the power supply circuit breaker. After a
2 second to 4 second delay, the following is displayed:
D
Blinking decimal point followed by a zero in
the
Average Current
and
Average Voltage
displays on the power supply front panel.
See Figure 2-8.
D
The amber-colored
Fixture
indicator light is
on indicating that the fixture block is not
attached to the weld head. See Figure 2-9.
If the power supply does not come on, refer to Section 7,
Troubleshooting,
for a list of possible causes and
corrective actions.
Figure 2-8 Average Current and
Voltage Displays
ÁÁÁ
ÁÁÁ
ÁÁÁ
ÁÁÁ
ÁÁÁ
Figure 2-9 Weld Status
Indicator Lights
ÁÁÁÁ
ÁÁÁÁ
ÁÁÁÁ
ÁÁÁÁ
ÁÁÁÁ
ÁÁÁÁ