
Weld Parameter Adjustment
CWS
−
D100
−
B Welding System
Swagelok Company, All rights reserved
September 2005
5-8
11. Calculate the Downslope:
a.
Calculate the Downslope using the
following formula:
Weld Time
×
0.5 = switch setting
For example, using the Weld Time of 38 in
step 10.e.:
38
×
0.5 = 19
b.
Set
DOWNSLOPE
(19) according to the result of the
formula in step 11.a.
12. Set
POSTPURGE
to 20.
Note:
The suggested minimum
Postpurge time is 20 seconds. This
time allows for sufficient cooling of
the electrode and weld zone.
Additional Postpurge time may be
necessary for a weld made with a
high average current setting.